Dukhiram Maurya Engineering constructs Asia’s Largest End Fired Furnace 650 TPD, HNG Nayudupeta, Andhra Pradesh.

We at Dukhiram Maurya Engineering & Refractory Works (I) Pvt. Ltd. are proud to announce another exceptional achievement—the successful and rapid completion of HNG Furnace #13.Dukhiram is proud to have successfully completed the rebuild of the 650 TPD glass melting furnace at HNG, Nayudupeta—Asia’s largest furnace rebuild project.

The project marks a major step toward Kioo, part of the Madhvani Group, entering the market following its takeover of HNG and efforts to revive the group. Rebuilding a furnace of this scale called for careful engineering, disciplined project management and close coordination across every stage of the work.

Furnace Light up Prayer Ceremony.

A complex rebuild, delivered from Glass Draining to New glass Out!

Dukhiram’s scope covered the full furnace rebuild process:

  1. Draining and cooling down the furnace. 
  2. Demolition of refractories and salvage of steel. 
  3. Modification, fabrication and erection of new structures and cooling steel parts. 
  4. Refractory installation across the regenerators, furnace, working end & forehearths – 4,500 MT. 
  5. Chimney Repair Refractory works
  6. Furnace heat-up and cullet fill 
  7. Hot sealing of the furnace

Project Highlights

  1. Minimised Downtime
  2. Zero Accident Record
  3. High-Quality Workmanship 
  4. Early Production goals: Substantial reduction of shutdown period, enabling our client to resume early production, thereby significantly reducing costs associated with prolonged downtime.

Every phase brought its own demands. Demolition and steel salvage had to be coordinated with the preparation of new structures. Refractory installation required precision across multiple furnace areas, with approximately 4,500 MT of material to install. The heat-up, cullet fill and hot sealing then called for careful sequencing as the furnace moved toward operation.

This achievement underscores Dukhiram’s dedication to technical excellence, efficient project management, and commitment to safety and quality compliance. The rapid execution of this critical project not only sets a new benchmark within our organization but also reinforces our unwavering promise to support our clients in achieving their production goals seamlessly and efficiently.

We continue to strive toward excellence, driven by innovation, integrity, and impeccable craftsmanship.

Furnace Light up Ceremony with Mr. K.K sir, Mr. P. Mazumdar sir.

Engineering and teamwork at scale

A project of this magnitude depends on more than construction capacity. It takes engineering judgment to manage the interfaces between steelwork and refractory installation, project management to keep complex work fronts aligned, and a team ready to solve problems as they arise.

Dukhiram’s team brought a solution-oriented mindset to the challenges of rebuilding Asia’s largest container glass furnace. Through close coordination and focused execution, the team completed the work to the client’s satisfaction.

We are proud of the role Dukhiram played in this important project and in supporting the next chapter for HNG and Kioo.

Share the Post:

Enquire Now

Our Representative will get in touch with you soon.